In St. Margrethen in the St. Gallen Rhine Valley, two apartments on the main street are to be used for erotic services in the future. The corresponding building application was open for public inspection. As Rheintal24 reported on September 19, 2026, opinion in the village is divided: several residents expressed discomfort, some consider such an offering unnecessary at the location, and others fear litter and disturbances around the property. The mayor is cautious on the matter and refers to the process: «What is important for us is that the framework conditions are met.» According to the report, no formal objections had been filed by the end of the objection period on September 18. Whether the business will actually be established is thus not yet decided.
Why this is relevant for the industry
Sex work is legal in Switzerland — but where it may take place is almost always decided by the municipality’s building and zoning law, not by criminal law. If an apartment is converted into a salon, this is a change of use and requires building permission. What matters, among other things, is whether the use is considered disruptive in the relevant zone. How strictly this is interpreted is shown by the same municipality: in 2022, the municipal council rejected an application on the main street because ideological emissions in the pronounced residential zone were classified as severely disruptive and parking was inadequately regulated (Nau.ch).
For sex workers, this has two very practical sides. First, the process is public: the address and the project are posted for public inspection, and the neighborhood can file objections — discretion is barely possible at the permit stage. Second, the workplace depends on the permit. Anyone renting a room or apartment should have it checked in writing before signing the contract to confirm that valid building permission exists for this specific use. If it is lacking, a ban on use threatens — and the workplace is gone from one day to the next. When approved salons are lacking, work tends to shift to informal apartments, where protection and oversight become more difficult.
Have you ever requested the building permit before moving into a salon — and how did the management react?